Browse The Echo Photographs > Echo Pics > November 2014 > turbine-2-(dan-linehan)
"<" back one image
forward one image ">"
turbine-2-(dan-linehan) 
 Irish Examiner News Picture 09-02-2014 Plus video 
The Cork Lower Harbour Energy Group project involves the installation of three wind turbine's, one each at DePuy Synthes, GSK and Janssen Biologics sites. This is the turvine at DePuy Synthes and it is expected to be fully operational by May 2014. The turbine has a hub height of 100 metres and a blade radius of 45 metres. Picture Dan Linehan
turbine-2-(dan-linehan) 
 Irish Examiner News Picture 09-02-2014 Plus video 
The Cork Lower Harbour Energy Group project involves the installation of three wind turbine's, one each at DePuy Synthes, GSK and Janssen Biologics sites. This is the turvine at DePuy Synthes and it is expected to be fully operational by May 2014. The turbine has a hub height of 100 metres and a blade radius of 45 metres. Picture Dan Linehan
© Evening Echo Publications Ltd

Irish Examiner News Picture 09-02-2014 Plus video
The Cork

Lower Harbour Energy Group project involves the installation of three wind turbine's, one each at DePuy Synthes, GSK and Janssen Biologics sites. This is the turvine at DePuy Synthes and it is expected to be fully operational by May 2014. The turbine has a hub height of 100 metres and a blade radius of 45 metres. Picture Dan Linehan



The Echo,  Linn Dubh,  Blackpool, Cork, Ireland and 80, Oliver Plunkett Street, Cork   Telephone 021 4802208 or 021 4802209